Skip to content

Curated evidence path

Metrology uncertainty to decision risk

Trace study design into variance components, guardband logic, and false-pass or false-fail risk without qualifying a gauge or disposing material.

Review question

How does measurement-system uncertainty change what a decision proxy can support?
Permanent path link
Nodes
5
Bridge edges
3
Stop edges
1
Measured causal edges
0

Evidence classes

Read the label before the color.

Ordered evidence chain

Follow each handoff. Stop at the stop.

Node order and edge fields are fixed by the V123 contract. No page interaction generates, ranks, or extends this chain.

  1. Measurement decision

    Study design and identity

    Part, repeat, operator, configuration, reference, and environment identity define the measurement question.

    metrology-study-design

    Evidence bridge

    study design to variance components

    Derived evidence
    Edge ID
    metrology-design-to-components
    From node
    metrology-study-design
    To node
    metrology-variation-components
    Unit or category
    variance / percent category
    Evidence class
    Derived
    Status
    Bridge
    Assumption
    The V122 replay deterministically calculates fields from synthetic states without fitting raw measurements.
    Bridge condition
    Use the decomposition only for the displayed crossed teaching design and preserve missing bias, stability, and reference evidence.
    Limitation
    No owned repeat measurements, randomization record, representative parts, instrument identity, environment, calibration, or residual analysis is included.
    Measured replacement slot
    Owned raw repeats with declared crossed or nested design, gauge/operator/configuration identity, references, environment, analysis, residuals, and uncertainty.
  2. Measurement decision

    Variation components

    The deterministic replay separates repeatability, reproducibility, bias, stability, resolution, and uncertainty review.

    metrology-variation-components

    Evidence bridge

    measurement uncertainty to decision guardband

    Proxy evidence
    Edge ID
    metrology-components-to-guardband
    From node
    metrology-variation-components
    To node
    metrology-guardband-proxy
    Unit or category
    decision-threshold category
    Evidence class
    Proxy
    Status
    Bridge
    Assumption
    The guardband is an original teaching proxy and is not a customer or production acceptance rule.
    Bridge condition
    Use only to show why uncertainty must remain attached to a decision threshold.
    Limitation
    No specification authority, risk allocation, distribution validation, calibration chain, or product context establishes a usable limit.
    Measured replacement slot
    Approved specification, measurement uncertainty budget, decision rule, distribution evidence, risk allocation, and accountable quality review.
  3. Measurement decision

    Guardband decision proxy

    A bounded decision state illustrates how uncertainty changes interpretation without setting a production limit.

    metrology-guardband-proxy

    Evidence bridge

    guardband to false-pass or false-fail risk

    Proxy evidence
    Edge ID
    metrology-guardband-to-risk
    From node
    metrology-guardband-proxy
    To node
    metrology-false-decision-risk
    Unit or category
    risk / yield category
    Evidence class
    Proxy
    Status
    Bridge
    Assumption
    The linked artifacts use independent synthetic distributions and do not share production data or a validated classifier.
    Bridge condition
    Treat the relation as a decision-literacy question, not a quantified escape or yield prediction.
    Limitation
    No production distribution, correlation-to-final-test, sampling proof, coverage model, label quality, drift monitoring, or shipped-product outcome is present.
    Measured replacement slot
    Rights-cleared paired measurement and outcome data with sample plan, coverage, label definition, drift controls, uncertainty, and validation.
  4. System / yield proxy

    False-pass / false-fail risk

    Wafer-sort and virtual-metrology artifacts frame decision risk with synthetic data only.

    metrology-false-decision-risk

    Evidence stop

    decision risk to wafer disposition

    Proxy evidence
    Edge ID
    metrology-risk-to-disposition-stop
    From node
    metrology-false-decision-risk
    To node
    metrology-disposition-stop
    Unit or category
    unsupported authority category
    Evidence class
    Proxy
    Status
    Stop
    Assumption
    Public teaching proxies carry no authority to accept, reject, rework, release, or close an excursion.
    Bridge condition
    Stop before control-limit change, process adjustment, lot disposition, quality release, or root-cause closure.
    Limitation
    Structural evidence completeness does not establish measurement validity, causal attribution, or production authority.
    Measured replacement slot
    Qualified measurement system, approved procedures and limits, real genealogy and outcome data, uncertainty, validation, and accountable disposition authority.
  5. Evidence stop

    Stop before disposition

    No real study, customer specification, production distribution, or accountable authority is present.

    metrology-disposition-stop

Path boundary

This path does not prove causality.

The navigator presents curated associations, assumptions, evidence classes, and replacement needs. It does not prove physical or statistical causality.

A stop is a product requirement, not missing UI. The page must not fill a stopped bridge with extrapolation, AI text, a recipe, an equipment setting, or an operating recommendation.

No public path authorizes process changes, equipment control, wafer disposition, qualification, signoff, product ranking, or production release.

Return to all causal chains