Package parasitics RLC budget
Compare teaching package cases by loop inductance, coupling capacitance, signal delay, and PDN impedance.
5 ps / 180 pH / 97.5%
Open simulation ->PACKAGING REPLAY LAB / SA-PTR-001
This lab collects four precomputed PTR simulations for paper-first review: package parasitics, thermal stack, wafer-sort guardband, and reliability stress vocabulary.
RUN ONE QUESTION
Every card keeps a condition, output, method, source, and limitation attached. The point is evidence discipline, not package or test release.
Compare teaching package cases by loop inductance, coupling capacitance, signal delay, and PDN impedance.
5 ps / 180 pH / 97.5%
Open simulation ->Add junction-to-case and case-to-ambient resistance while keeping hotspot coupling visible.
15 C/W / 0.72 / 1.58 W
Open simulation ->Replay a teaching guardband tradeoff between yield, top bin, estimated escapes, and retest load.
83% / 900 ppm / 4.2%
Open simulation ->Connect infant mortality, useful life, wearout, and accelerated stress vocabulary without claiming qualification.
108 FIT / 8 FIT / 4 modes
Open simulation ->MODEL BOUNDARY
The public replay is for teaching, figures, and early paper planning. It is not package signoff, thermal design release, bin-limit release, a production screen, reliability release, or a customer quality claim.
Open package, thermal, sort, and reliability data with assumptions visible.
Use the public source notes and limitations when making slides, drafts, or teaching figures.
No account, upload, production tester run, package design release, field-return intake, reliability signoff, or customer-quality action is present.