Ellipsometry thickness fit
Replay a thin-film thickness fit and inspect residuals so a plotted film thickness is not separated from its optical-model assumptions.
27.8 nm / 0.08 deg / +/-0.8 nm
Open simulation ->PROCESS REPLAY LAB / SA-PROC-003
This lab collects six precomputed metrology simulations for paper-first review: film thickness, sheet resistance, TLM, CD/overlay, SPC capability, and DOE response surfaces.
RUN ONE QUESTION
Every card keeps a measurement condition, extraction rule, source anchor, and limitation attached. The point is metrology discipline, not facility operation.
Replay a thin-film thickness fit and inspect residuals so a plotted film thickness is not separated from its optical-model assumptions.
27.8 nm / 0.08 deg / +/-0.8 nm
Open simulation ->Replay a wafer-level sheet-resistance map and compute nonuniformity before treating a process split as electrically stable.
50.4 ohm/sq / +/-3.97% / 25 points
Open simulation ->Fit resistance versus contact spacing to separate sheet resistance, contact resistance, and geometry assumptions.
Rc = 4 ohm/pad / 80 ohm/sq / 4.0e-6 ohm cm2
Open simulation ->Replay CD site statistics and overlay vectors so lithography evidence carries linewidth and registration together.
100.61 nm / 3 sigma = 1.97 nm / p95 = 3.08 nm
Open simulation ->Replay a CD sample set and compute Cp/Cpk so process spread, centering, and out-of-spec count stay distinct.
Cp = 1.44 / Cpk = 1.34 / 0 / 25
Open simulation ->Replay a two-factor process grid so deposition rate, film stress, center points, and curvature warnings travel together.
64 nm/min / 56 nm/min / -110 MPa
Open simulation ->MODEL BOUNDARY
The public replay is for teaching, figures, and early paper planning. It is not a calibrated tool report, process recipe, wafer qualification, control dashboard, or signoff result.
Open thickness fits, wafer maps, line fits, CD/overlay vectors, SPC samples, and DOE matrices with assumptions visible.
Use the public source notes and limitations when planning slides, drafts, figures, or classroom examples.
No process upload, tool account, facility credential, live execution, endpoint control, release dashboard, or qualified metrology claim is present.